skip navigation
MyAccount
Mobile Site
Full Site
Accessibility
Contact Us
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z


Home
Pay for it Apply for it Report it Latest News What's On

You are here: Home / About The Council / Agenda and minutes

Quick Links

 Meetings, agendas and minutes

 Calendar

 Committees

 Constitution

 Election Results

 Decisions

 ePetitions

 Notice of Key Decisions

 Library

 Meetings

 Outside bodies

 Search documents

 Subscribe to updates

 What's new

 Your Councillors

 Your County Councillors

 Your MEPs

 Your MPs

Agenda and minutes

Venue: Collingwood Room - Civic Offices. View directions

Contact: Democratic Services  Tel: 01329 236100

Items
No. Item

1.

Apologies for Absence

Minutes:

An apology of absence was received from Councillor P Nother.

2.

Minutes of Previous Meeting pdf icon PDF 288 KB

To confirm as a correct record the minutes of the Planning Committee meeting held on 9 November 2022.

 

Minutes:

RESOLVED that the minutes of the Planning Committee meeting held on 9 November 2022 be confirmed and signed as a correct record.

3.

Chairman's Announcements

Minutes:

The Chairman made the following announcement:

 

“I would like to announce that as from the January meeting, we will be making a slight change to the deputation scheme which will mean that any written deputations submitted will no longer be read out at the meeting but will be shared with Planning Committee Members ahead of the meeting. This will ensure that the decision makers have plenty of time to consider the content of written deputations.

 

To ensure continued transparency, I will confirm at the start of each item that Members have received and read the deputations and the content will be treated as background papers and will be appropriately saved by Democratic Services.

 

The relevant changes to the Constitution and Council’s webpages will be made to enable this slight change in procedure.”

4.

Declarations of Interest

To receive any declarations of interest from members in accordance with Standing Orders and the Council’s Code of Conduct.

Minutes:

There were no declarations of interest made at this meeting.

5.

Deputations

To receive any deputations of which notice has been lodged.

Minutes:

The Committee received a deputation from the following in respect of the applications indicated and were thanked accordingly.

 

Name

Spokesperson representing the persons listed

Subject

Supporting or Opposing the Application

Minute No/ Application No/Page No

 

Dep

Type

 

 

 

 

 

 

 

ZONE 1 – 1.00pm

 

 

 

 

 

Mr John Boardman (Agent)

 

land off rookery avenue – residential development of 32 dwellings, parking and a means of access from rookery avenue following demolition of 2 dwellings, glasshouses and associated outbuildings

Supporting

6(1)

P/19/0870/FP

Pg 20

In Person

(3mins)

Mr Rob Megginson

 

LAND ADJACENT TO 125 GREENAWAY LANE, WARSASH, SOUTHAMPTON - RESERVED MATTERS APPLICATION PERTAINING TO LAYOUT, SCALE, APPEARANCE AND LANDSCAPING FOR THE CONSTRUCTION OF 80 DWELLINGS TOGETHER WITH ASSOCIATED PARKING, OPEN SPACE, LANDSCAPING AND OTHER INFRASTRUCTURE AND DEVELOPMENT WORKS, PURSUANT TO OUTLINE PLANNING PERMISSION P/19/0402/OA AND APPROVAL OF DETAILS REQUIRED BY CONDITIONS 7 AND 18 (BIODIVERSITY & ENHANCEMENT MITIGATION STRATEGY) AND 9(I) ARCHAEOLOGY OF P/19/0402/OA.

Opposing

6(2)

P/21/1780/RM

Pg 52

Written

 

Mr Richard Jarman

 

14 MARINERS WAY, WARSASH - RAISE RIDGE HEIGHT, EXTERNAL ALTERATIONS TO INCLUDE FRONT EXTENSION, REAR BALCONY, FIRST FLOOR SIDE EXTENSION AND SECOND FLOOR LOFT CONVERSION WITH FRONT/REAR DORMERS, RENDER, CLADDING AND FENESTRATION INSTALL

Opposing

6(3) P/22/1312/FP

Pg 75

In Person

(3mins)

ZONE 2 – 2.00pm

 

 

 

 

 

Mr Bob Marshall

The Fareham Society

WELBORNE LAND NORTH OF FAREHAM - RESERVED MATTERS FOR ACCESS, APPEARANCE, LANDSCAPE, LAYOUT AND SCALE FOR THE CREATION OF A NORTH TO SOUTH BRIDLEWAY CONNECTION ON THE WESTERN SIDE OF WELBORNE INCLUDING CONNECTIONS TO EXISTING PUBLIC RIGHTS OF WAY, THE PROVISION OF A CAR PARK TO SUPPORT THE USE OF DASHWOOD AS A SANG, PUBLIC RIGHT OF WAY PROVISION AT FAREHAM COMMON AND REQUISITE UTILITY CONNECTIONS TO SERVE THE FIRST PHASES OF DEVELOPMENT, INCLUDING ANY ASSOCIATED HARD AND SOFT LANDSCAPING, DRAINAGE, CONSTRUCTION ACCESS, ENGINEERING OPERATIONS AND EARTHWORKS INCLUDING DETAILS PURSUANT TO CONDITIONS 45 (DASHWOOD CAR PARK PROVISION) AND 56 (WORK WITHIN 15M OF THE GAS MAIN).

Opposing

6(5)

P/22/0867/RM

Pg 98

In Person (3mins)

Mr Bob Marshall

The Fareham Society

WELBORNE, LAND NORTH OF FAREHAM –

RESERVED MATTERS IN RELATION TO OUTLINE PLANNING PERMISSION P/17/0266/OA: FOR ACCESS, APPEARANCE, LANDSCAPE, LAYOUT AND SCALE FOR THE CONSTRUCTION OF HAUL ROADS AND INITIAL BASE COURSE ROAD CARRIAGEWAY RELATED TO THE DELIVERY OF INITIAL PHASES OF WELBORNE TO THE NORTH OF KNOWLE ROAD, INCLUDING ANY ASSOCIATED DRAINAGE, SOIL MOVEMENT, UTILITY CONNECTIONS, SUBSTATIONS, CONSTRUCTION ACCESS, ENGINEERING OPERATIONS AND EARTHWORKS INCLUDING DETAILS PURSUANT TO CONDITIONS 13 (COMPLIANCE WITH THE SITE WIDE BIODIVERSITY ENHANCEMENT STRATEGY), 16 (SCALE, MATERIALS, DESIGN AND LANDSCAPING), 17 (LEVELS), 19 (CONTAMINATION), 22 (CEMP), 27 (SURFACE WATER DRAINAGE), 28 (ECOLOGY MITIGATION), 29 (TREES) AND 56 (CROSSING OF THE GAS PIPELINE)

Opposing

6(6)

P/22/1020/RM

In Person (3mins)

ZONE 3 – 3.00pm

 

 

 

 

 

Mr Paul Woodman

The Portchester Society

ASSHETON COURT CASTLE STREET PORTCHESTER – DEMOLITION OF EXISTING BUILDING AND CONSTRUCTION OF 60 ONE AND TWO BEDROOM FLATS WITH ASSOCIATED EXTERNAL WORKS AND LANDSCAPING

Supporting

6(7)

P/22/1012/FP

Pg 133

Written

 

Mrs Robyn Lyons (FBC)

 

-Ditto-

-Ditto-

-Ditto-

In Person

(3 mins)

Mr Tom Betts

(Agent)

 

CAMS HILL SCHOOL SHEARWATER AVENUE FAREHAM – CONSTRUCTION OF 3G SPORTS PITCH WITH ASSOCIATED FEATURES INCLUDING 6NO. 12M HIGH LED FLOODLIGHTS, FENCING AND ALTERATIONS TO PEDESTRIAN AND VEHICULAR ACCESS WITHIN THE SCHOOL SITE

Supporting

6(8)

P/22/1253/FP

Pg 164

In Person

(3mins)

 

6.

Planning applications and Miscellaneous Matters including an update on Planning Appeals pdf icon PDF 69 KB

To consider a report by the Director of Planning and Regeneration on development control matters, including information regarding new planning appeals and decisions.

Minutes:

The committee noted a report by the Director of Planning and Regeneration on the development control matters, including information regarding new appeals and decisions.

6(1)

P/19/0870/FP - LAND OFF ROOKERY AVENUE WHITELEY pdf icon PDF 2 MB

Minutes:

The Committee received the deputation referred to in Minute 5 above.

 

(Councillor M J Ford, JP was absent from the meeting during this item)

 

Upon being proposed and seconded, the officer recommendation to grant planning permission, subject to:

 

i)             The applicant/owner first entering into a planning obligation under Section 106 of the Town and Country Planning Act 1990 on terms drafted by the Solicitor to the Council to secure:

 

a.    Financial contributions to provide for satisfactory mitigation of the ‘in combination’ effects that the increase in residential units on the site would cause through increased recreational disturbance on the Solent and Southampton Water and Portsmouth Harbour Special Protection Areas;

 

b.    Hampshire County Council reptile translocation contribution;

 

c.    Traffic Regulation Order (TRO) for parking restriction works to junction of site with Rookery Avenue and Shetland Rise;

 

d.    The delivery of 40% of the permitted dwellings as a mixture of 12 on-site affordable houses and an off-site financial contribution equivalent to 0.8 of a unit; and

 

ii)            The conditions in the report.

Was voted on and CARRIED.

(Voting: 8 in favour; 0 against)

 

RESOLVED that, subject to: -

 

i)             The applicant/owner first entering into a planning obligation under Section 106 of the Town and Country Planning Act 1990 on terms drafted by the Solicitor to the Council to secure:

 

a.    Financial contributions to provide for satisfactory mitigation of the ‘in combination’ effects that the increase in residential units on the site would cause through increased recreational disturbance on the Solent and Southampton Water and Portsmouth Harbour Special Protection Areas;

 

b. Hampshire County Council reptile translocation contribution;

 

c.    Traffic Regulation Order (TRO) for parking restriction works to junction of site with Rookery Avenue and Shetland Rise;

 

d.    The delivery of 40% of the permitted dwellings as a mixture of 12 on-site affordable houses and an off-site financial contribution equivalent to 0.8 of a unit; and

 

ii)            The conditions in the report.

PLANNING PERMISSION be granted.

 

6(2)

P/21/1780/RM - LAND ADJACENT TO 125 GREENAWAY LANE WARSASH SO31 9HT pdf icon PDF 1 MB

Minutes:

The Committee received the deputation referred to in Minute 5 above.

 

(Councillor M J Ford, JP was absent from the meeting during this item)

 

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

1.1  additional representation received raising the following queries:

 

a.    Can the council confirm that a play area will be located on land to the south of Greenaway Lane and on which site?

b.    Can the council clarify their position on the two junior football pitches as detailed in the draft local plan?

 

Officer comment:

a.    The s106 secures a financial contribution towards a play area on land to the south of Greenaway Lane. The location of the play area has not yet been agreed but will be confirmed within the ‘scheme of works’ required by the s106.

b.    Policy HA1 of Emerging Local Plan states that 2 junior football pitches will be required within the area allocated for development within policy HA1. Officers can confirm that policy requirements will be sought as part of any future applications relating to land allocated under HA1.

 

2. Update to part A of the recommendation to confirm that the pedestrian and cycle routes will also be maintained by the management company:

 

A)   DELEGATE to the Head of Development Management in consultation with the Solicitor to the Council to complete a legal agreement to ensure:

 

i)             the creation of a management company (funded by a residents’ service charge) to maintain and manage the open space, sustainable urban drainage features, pedestrian/cycle routes and ecological corridors in perpetuity;

ii)            a mechanism for securing appropriate funding of the management company for the lifetime of the development;

iii)           a mechanism for ensuring collection and enforcement of the funding stream provided in ii) above to fund the monitoring and management of the communal areas of the development for the lifetime of the development;

iv)           the creation of and retention of an ecological corridor along part of the eastern boundary.

 

Upon being proposed and seconded the officer recommendation to grant approval of the reserved matters application and approval of details pursuant to conditions 7, 9(I) and 18 of P/19/0402/OA, subject to: -

 

a)    DELEGATION be given to the Head of Development Management in consultation with the Solicitor to the Council to complete a legal agreement to ensure:

 

i)             the creation of a management company (funded by a residents’ service charge) to maintain and manage the open space, sustainable urban drainage features, pedestrian/cycle routes and ecological corridors in perpetuity;

 

ii)            a mechanism for securing appropriate funding of the management company for the lifetime of the development;

 

iii)           a mechanism for ensuring collection and enforcement of the funding stream provided in ii) above to fund the monitoring and management of the communal areas of the development for the lifetime of the development;

 

iv)           the creation and retention of an ecological corridor along part of the eastern boundary; and

 

b)    The conditions in the report.

Was voted on and CARRIED.

(Voting: 8 in favour; 0 against)

 

RESOLVED that, subject to: -

 

a)    DELEGATION be given to the Head of Development Management in consultation with the Solicitor to the Council to complete a legal agreement to ensure:

 

i)             the creation of a management company (funded by a residents’ service charge) to maintain and manage the open space, sustainable urban drainage features, pedestrian/cycle routes and ecological corridors in perpetuity;

 

ii)            a mechanism for securing appropriate funding of the management company for the lifetime of the development;

 

iii)           a mechanism for ensuring collection and enforcement of the funding stream provided in ii) above to fund the monitoring and management of the communal areas of the development for the lifetime of the development;

 

iv)           the creation and retention of an ecological corridor along part of the eastern boundary; and

 

b)    The conditions in the report.

APPROVAL of RESERVED MATTERS and DETAILS PURSUANT to conditions 7, 9(I) and 18 of P/19/0402/OA be granted.

 

6(3)

P/22/1312/FP - 14 MARINERS WAY WARSASH SO31 9FN pdf icon PDF 1005 KB

Minutes:

The Committee received the deputation referred to in Minute 5 above.

 

(Councillor M J Ford, JP had joined the meeting at the start of this application and was able to take part in the debate and vote on the application)

 

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

One further letter of objection has been received in relation to the latest revision, raising the following concerns: -

 

·         More overbearing and overlooking to all neighbours, and will materially increase the light shadow over us

·         Affect the harmony of the existing roof lines in this side of Mariners Way making it a visual eyesore for everyone on the street

 

Upon being proposed and seconded the Officer recommendation to grant planning permission, subject to the conditions in the report, was voted on and CARRIED.

(Voting: 8 in favour; 1 against)

 

RESOLVED that, subject to the conditions in the report, PLANNING PERMISSION be granted.

6(4)

P/19/0437/FP - FAREHAM POINT WICKHAM ROAD PO16 7FN pdf icon PDF 1 MB

Minutes:

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

The following conditions has been included as part of the recommendation for Approval:

 

7) The development hereby permitted shall not commence unless the Council has received the Notice of Purchase in accordance with the legal agreement between FBC, SDNPA and Andrew Sellick of Gawthorpe Estate dated 1 April 2021 in respect of the Credits Linked Land identified in the Nitrates Mitigation Proposals Pack.

 

REASON: To demonstrate that suitable mitigation has been secured in relation to the effect that nitrates from the development has on the Protected Sites around the Solent.

 

8) No development shall take place beyond damp proof course (dpc) level until details of how and where Electric Vehicle (EV) charging points will be provided at the following level:

 

At least one Electric Vehicle (EV) charging point per dwelling with allocated parking provision;

 

The development shall be carried out in accordance with the approved details with the charging point(s) provided prior to first occupation of dwelling to which it serves.

REASON: To promote sustainable modes of transport, to reduce impacts on air quality arising from the use of motorcars and in the interests of addressing climate change.

 

Upon being proposed and seconded the officer recommendation to grant planning permission subject to the conditions in the report, and the update report, was voted on and CARRIED.

(Voting: 9 in favour; 0 against)

 

RESOLVED that, subject to the conditions in the report and update report, PLANNING PERMISSION be granted.

6(5)

P/22/0867/RM - WELBORNE LAND NORTH OF FAREHAM pdf icon PDF 1 MB

Minutes:

The Committee received the deputation referred to in Minute 5 above.

 

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

The following conditions are included as part of the recommendation for Approval:

 

1)    The works hereby approved shall be undertaken within three years from the date of this consent.

REASON: To allow a reasonable time period for work to start, to comply with Section 91 of the Town and Country Planning Act 1990, and to enable the Council to review the position if a fresh application is made after that time.

 

2)    The development shall be carried out in accordance with the following approved documents:

·         Drawing WEL-PBF-WM-XX-DR-CH-00010 Revision S4-P10 Reserved Matters Application Redline Boundary

·         Drawing WEL-PBF-WM-XX-DR-CH-00018 Revision S4-P01 Reserved Matters Application Construction Access Visibility

·         Drawing WEL-PBF-HB-XX-DR-CD-00101 Revision S4-P01 Septic Tank

·         Drawing WEL-PBF-WM-XX-DR-CH-00015 Revision S4-P03 Reserved matters Application Construction Compound & Access

·         Drawing WEL-PBF-WM-XX-DR-CH-00001 Revision S4-P13 Engineering Layout Sheet 1 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00002 Revision S4-P11 Engineering Layout Sheet 2 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00003 Revision S4-P09 Engineering Layout Sheet 3 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00004 Revision S4-P10 Engineering Layout Sheet 4 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00005 Revision S4-P10 Engineering Layout Sheet 5 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00013 Revision S4-P02 Engineering Layout Sheet 6 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00014 Revision S4-P06 Engineering Layout Sheet 7 of 8

·         Drawing WEL-PBF-WM-XX-DR-CH-00017 Revision S4-Poo Engineering Sheet 8 of 8

·         Drawing DD557L5-3 Revision C INF2 Landscape Mitigation Area F

·         Drawing DD557L5-2 Revision D INF2 Landscape Mitigation Area C, D & E

·         Drawing DD557L5-1 Revision D INF2 Landscape Mitigation Area A & B

·         REASON: To avoid any doubt over what has been permitted.

 

3)    The development shall be undertaken in accordance with the Outline Construction Environmental Management Plan, dated October 2022, prepared by Mayer Brown and its associated appendices.

REASON: To protection the occupiers of nearby residential properties and surrounding ecological features against noise and disturbance during the construction period.

 

4)    Notwithstanding the detail within the Construction Environmental Management Plan (CEMP) no work on site relating to the construction of any of the development hereby permitted (including works of demolition or preparation prior to operations) shall take place before the hours of 0800 or after 1800 Monday to Friday, before the hours of 0800 or after 1300 Saturdays or at all on Sundays or recognised bank and public holidays, unless otherwise first agreed in writing with the Local Planning Authority.

REASON: To protect the occupiers of nearby residential properties against noise and disturbance during the construction period.

 

5)    Should contamination be encountered during works that has not been investigated or considered in the agreed scheme of remedial measures all work in the affected area must stop immediately. A site investigation, risk assessment and a detailed remedial method statement shall be submitted to and agreed in writing by the Local Planning Authority for the affected area. The remediation shall be fully implemented in-accordance with the approved method statement prior to work re-commencing in the affected area.

REASON: To protect the on-site workers, future occupants of the site and nearby residential properties.

 

6)    No development shall take place within 50m of trees or hedgerows to be protected as identified in the Arboricultural Method Statement dated September 2022, reference JFA0173INF2 until the measures of tree and hedgerow protection as set out in Appendix JF3 of the same Arboricultural Method Statement have been implemented and these shall be retained throughout the development period until such time as all equipment, machinery and surplus materials have been removed from the site. There shall be no storage of materials, plant or equipment at any time within the areas of tree protection fencing.

REASON: To ensure that the trees, shrubs and other natural features to be retained are adequately protected from damage to health and stability during the construction period. The details secured by this condition are considered essential to be agreed prior to the commencement of development on the site so that appropriate measures are in place to avoid the potential impacts described above.

 

7)    The new footpath for the diverted Right of Way 87, as shown on Drawing WEL-PBF-WM-XX-DR-CH-00014 Revision S4-P06 Engineering Layout Sheet 7 of 8, shall be constructed and laid out for public use within eight weeks from the commencement of development on any land north of Knowle Road and shall be retained thereafter with the exception of the connection directly adjacent to the A32. Until such time as the path connection directly adjacent to the A32 is provided and is open for public use a banksman shall be in place at the Heytesbury Farm/A32 access to manage any conflict between vehicles and the users of the path as set out in Paragraphs 513-5.15 of the Construction Traffic Management Plan, titled “Use of Traffic Marshalls”.

REASON: In the interest of the public safety during the construction period.

 

8)    The temporary haul roads hereby permitted shall be removed once they are no longer required for this purpose. Once removed the land shall be restored to its former state unless a subsequent permission / permissions have been granted on the land, or unless otherwise agreed in writing with the Local Planning Authority.

REASON: In the interest of the visual amenities of the area.

 

Upon being proposed and seconded the officer recommendation to approve the reserved matters and details pursuant to conditions 45 and 56, subject to the conditions in the update report, was voted on and CARRIED.

(Voting: 9 in favour; 0 against)

 

RESOLVED that, subject to the conditions in the update report, APPROVAL for RESERVED MATTERS and DETAILS PURSUANT to conditions 45 and 56 is granted.

6(6)

P/22/1020/RM - WELBORNE LAND NORTH OF FAREHAM pdf icon PDF 1 MB

Minutes:

The Committee received the deputation referred to in Minute 5 above.

 

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

Consultations:

 

Lead Local Flood Authority: No Objection

·         Infiltration rates have been provided and the calculations have been updated accordingly.

·         Suitable storage is available for the proposals, and evidence has been provided to show that future phases can connect into this system subject to the proposed impermeable area.

·         Any extra storage required for future development in addition to that proposed in this application is to be provided as phases are developed.

 

Recommendation:

 

The following conditions are included as part of the recommendation for Approval:

 

1)    The works hereby approved shall be undertaken within three years from the date of this consent.

REASON: To allow a reasonable time period for work to start, to comply with Section 91 of the Town and Country Planning Act 1990, and to enable the Council to review the position if a fresh application is made after that time.

 

2)    The development shall be carried out in accordance with the following approved documents:

a)    Drawing WEL-PBF-00-XX-DR-CH-00120 Revision S4-P03 “Reserved Matters Application Redline Boundary”

b)    Drawing WEL-PBF-DW-XX-DR-CH-00101 Revision S4-P04 “Engineering layout sheet 1 of 8”

c)    Drawing WEL-PBF-DW-XX-DR-CH-00102 Revision S4-P04 “Engineering Layout Sheet 2 0f 8”

d)    Drawing WEL-PBF-DW-XX-DR-CH-00103 Revision S4-P04 “Engineering Layout Sheet 3 of 8”

e)    Drawing WEL-PBF-CH-XX-DR-CH-00104 Revision S4-P03 “Engineering Layout Sheet 4 of 8”

f)     Drawing WEL-PBF-CH-XX-DR-CH-00105 Revision S4-P03 “Engineering Layout Sheet 5 of 8”

g)    Drawing WEL-PBF-CH-XX-DR-CH-00106 Revision S4-P03 “Engineering Layout Sheet 6 of 8”

h)    Drawing WEL-PBF-HB-XX-DR-CH-00107 Revision S4-P04 “Engineering Layout Sheet 7 of 8”

i)     Drawing WEL-PBF-HB-XX-DR-CH-00108 Revision S4-P04 “Engineering Layout Sheet 8 of 8”

j)     Drawing WEL-PBF-00-XX-DR-CH-00130 Revision S4-P03 “Reserved Matters Application Site Compound, Spoil & Tracking”

k)    Drawing WEL-BBF-00-XX-CD-CH-00151 Revision S4-P02 “Standard Details Highway Details”

l)     Drawing WEL-PBF-00-CD-CH-00152 Revision S4-P03 “Standard Details Drainage Details”

m)  Drawing WEL-PBF-00-XX-DR-CH-00131 Revision S4-P01 “Reserved Matters Application Site compounds & Access Visibility”

n)    Drawing DD557L06 Revision C “INF4 Interim Landscape Proposals”

o)    Drawing A-200 “Substation Plan and Elevation”

p)    Drawing A-201 “Communications Building Plan and Elevation”

REASON: To avoid any doubt over what has been permitted.

 

3)    The development shall be undertaken in accordance with the Outline Construction Environmental Management Plan, dated October 2022, prepared by Mayer Brown and its associated appendices.

REASON: To protect the occupiers of nearby residential properties and surrounding ecological features against noise and disturbance during the construction period.

 

4)    Notwithstanding the detail within the Construction Environmental Management Plan (CEMP) no work on site relating to the construction of any of the development hereby permitted (Including works of demolition or preparation prior to operations) shall take place before the hours of 0800 or after 1800 Monday to Friday, before the hours of 0800 or after 1300 Saturdays or at all on Sundays or recognised bank and public holidays, unless otherwise first agreed in writing with the Local Planning Authority.

REASON: To protect the occupiers of nearby residential properties against noise and disturbance during the construction period.

 

5)    No development shall take place in the locations identified in the Omnia Phase 1 Geo-Environmental Site Assessment (Ref: A11744/1.1) until the applicant has submitted to and had approved in writing by the Local Planning Authority an intrusive site investigation and an assessment of the risks posed to human health, and the wider environment including water resources for those specifically targeted areas within the application site. Where the site investigation and risk assessment reveals a risk to receptors, a strategy of remedial measures and detailed method statement to address identified risks shall be part of the submission to the Local Planning Authority. The details shall include the nomination of a competent person to oversee the implementation of the measures.

REASON: To protect the on site workers, future occupants of the site and nearby residential properties.

 

6)    Prior to commencement of the site operations (including works of the site set up and demolition works) in the targeted areas as identified as locations in the Omnia Phase 1 Geo-Environmental Site Assessment (Ref: A11744/1.1) the agreed scheme of remedial measures in condition 5 shall be fully implemented.

Remedial measures shall first be validated in writing by an independent competent person as agreed with the approved remedial measures under condition 5. The validation shall include (where necessary) photographic evidence and as built drawings.

REASON: To protection the on site workers, future occupants of the site and nearby residential properties.

 

7)    Should contamination be encountered during works that has not been investigated or considered in the agreed scheme of remedial measures all work in the affected area must stop immediately. A site investigation, risk assessment and a detailed remedial method statement shall be submitted to and agreed in writing by the Local Planning Authority for the affected area. The remediation shall be fully implemented in accordance with the approved method statement prior to work re-commencing in the affected area.

REASON: To protect the on site workers, future occupants of the site and nearby residential properties.

 

8)    No development shall take place within 50m of trees or hedgerows to be protected as identified in the Arboricultural Method Statement dated September 2022, reference JFA0173INF4 until the measures of tree and hedgerow protection as set out in Appendix JF3 of the same Arboricultural Method Statement have been implemented and these shall be retained throughout the development period until such time as all equipment, machinery and surplus materials have been removed from the site. There shall be no storage of materials, plant or equipment at any time within the areas of tree protection fencing.

REASON: To ensure that the trees, shrubs and other natural features to be retained are protected from damage to health and stability during the construction period. The details secured by this condition are considered essential to be agreed prior to the commencement of development on the site so that appropriate measures are in place to avoid the potential impacts described above.

 

9)    The new footpath for the diverted Right of Way 87, as shown on Drawing WEL-PBF-WM-XX-DR-CH-00014 Revision S4-P06 Engineering Layout Sheet 7 0f 8, shall be constructed and laid out for public use within eight weeks from the commencement of development and shall be retained thereafter with the exception of the connection directly adjacent to the A32. Until such time as the path connection directly adjacent to the A32 is provided and is open for the public use a banksman shall be in place at the Heytesbury Farm/A32 access to manage any conflict between vehicles and the users of the path as set out within Paragraph 5.15 of the Construction Traffic Management Plan, titled “Use of Traffic Marshalls”.

REASON: In the interest of public safety during the construction period.

 

Upon being proposed and seconded, the officer recommendation to grant reserved matters and approval of details pursuant to conditions 13, 16, 17, 19, 22, 27, 28, 29 and 56, subject to the conditions in the Update Report, was voted on and CARRIED.

(Voting: 9 in favour; 0 against)

 

RESOLVED that, subject to the conditions in the update report, APPROVAL is granted for the RESERVED MATTERS and DETAILS PURSUANT to Conditions 13, 16, 17, 19, 22, 27, 28, 29 and 56.

6(7)

P/22/1012/FP - ASSHETON COURT CASTLE STREET PORTCHESTER PO16 9PT pdf icon PDF 1 MB

Minutes:

The Committee received the deputations referred to in Minute 5 above.

 

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

Two further comments have been received from members of the public, both of whom had previously commented, raising no new matters.

 

The applicant has provided a roof plan which has been added to the application file. The list of approved drawings and documents under Condition 2 is therefore proposed to be expanded to include “Proposed Roof Plan – 20-026-0007 P01”.

 

Following discussion with the applicant, suggested Condition 3 a) & b) is proposed to be amended to read (additional wording underlined):

 

“a) Details of how provision is to be made on site or nearby for the parking and turning of operatives/contractors’/sub-contractors’ vehicles and/or construction vehicles

 

b) The measures the developer will implement to ensure that operatives’/contractors/sub-contractors’ vehicles and/or construction vehicles are parking within the planning application site or nearby as identified in the details provided pursuant to a) above.”  

 

 

Upon being proposed and seconded the officer recommendation to grant planning permission, subject to: -

 

(i)            DELEGATION be given to the Head of Development Management in consultation with the Solicitor to the Council to consider any comments received from Natural England relating to the consultation on the Appropriate Assessment and to make any minor modifications to the proposed conditions, addition of conditions or any other subsequent minor changes arising as a result of Natural England’s comments regarding the Appropriate Assessment;

 

(ii)          The Conditions in the report; and

 

(iii)         The amended Conditions 2 and 3 as set out in the Update Report.

Was voted on and CARRIED.

(Voting: 9 in favour; 0 against)

 

RESOLVED that, subject to: -

 

(i)            DELEGATION be given to the Head of Development Management in consultation with the Solicitor to the Council to consider any comments received from Natural England relating to the consultation on the Appropriate Assessment and to make any minor modifications to the proposed conditions, addition of conditions or any other subsequent minor changes arising as a result of Natural England’s comments regarding the Appropriate Assessment;

 

(ii)          The Conditions in the report; and

 

(iii)         The amended Conditions 2 and 3 as set out in the Update Report.

PLANNING PERMISSION be granted.

6(8)

P/22/1253/FP - CAMS HILL SCHOOL SHEARWATER AVENUE pdf icon PDF 1 MB

Minutes:

The Committee received the deputation referred to in Minute 5 above.

 

The Committee’s attention was drawn to the Update Report which contained the following information: -

 

Condition 2 has been amended to include two additional plans which were omitted in error. The condition would read as follows with the additional plan numbers in bold;

 

2.The development hereby permitted shall be carried out strictly in accordance with the following drawings/documents:

 

            i)Location Plan S22-049 / DWG / 0001

            ii)Proposed Site Plan S22-049 / DWG / 0003

            iii)Proposed Layout S22-049 / DWG / 0005

            iv)Proposed Layout S22-049/DWG/0006

            v)Proposed Drainage S22-049 / DWG / 0007

            vi)Proposed Structures S222-049/DWG/0009

            vii)Proposed Elevations S22-049 / DWG / 0010

viii)Tree Survey Report and Arboricultural Impact Assessment (ref: JSL4460_770)

            ix)Ecological Assessment (RPS, July 2022)

x)Flood Risk Assessment and Drainage Strategy (reference: R-FRA-24796-01-0)

            xi)Flood Lighting Calculations (October 2022)

            xii)Proposed Floodlights S22-049 /DWG / 0008 Rev 01

            REASON: To avoid any doubt over what has been permitted.

 

Upon being proposed and seconded, the officer recommendation to grant planning permission, subject to the conditions in the report and the amended condition 2 in the update report, was voted on and CARRIED.

(Voting: 9 in favour; 0 against)

 

RESOLVED that, subject to, the conditions in the report and amended condition 2 in the update report, PLANNING PERMISSION be granted.

6(9)

Planning Appeals pdf icon PDF 143 KB

Minutes:

The Committee noted the information in the report.

6(10)

UPDATE REPORT pdf icon PDF 124 KB

Minutes:

The Update Report was circulated prior to the meeting and considered along with the relevant agenda item.

7.

Local Information Requirements pdf icon PDF 313 KB

To consider a report by the Director of Planning and Regeneration on the proposed changes to the local information requirements.

Minutes:

The Committee considered a report by the Director of Planning and Regeneration on Local Information Requirements.

 

RESOLVED that the Members agreed that the proposed changes to Fareham Borough Council’s Local Information Requirements are put out for public consultation.

 

 




Browse

Follow us

Facebook Twitter You Tube Flickr

View Fareham
Today online





Fareham Borough Council, Civic Offices, Civic Way, Hampshire, PO16 7AZ
Tel: +44 (0) 1329 236100 | Mobile Text/Photo: 07860 098627 | Fax: +44 (0) 1329 821770
Read page with Browse Aloud GOV.UK Get Safe Online
Fareham Borough Council: List of RSS Feeds